City Of Bellevue Water Standard Details
Please see our list of changes to pre approved plans and policies.
City of bellevue water standard details. 2 the water main and the sewer are not installed within the same trench. Filling new water mains. The engineering department functions are under the supervision of city engineer kevin scagnetti. The city provides current and previous water engineering standards including detail drawings and a summary of the updates to the standards.
2020 standard specifications and details. 3 the water main is appropriately constructed to prevent contamination of the water in the main by sewer leakage. Typical trench detail w 7. The 2020 standard specifications and details document is now available.
Detail 03 11 01 water vault details. Bellevue design standards revised 8 12 14 curb cut and driveway standard detail set. Below are the documents outlining the engineering standards and specifications for the village s public works projects. Vertical blocking for connecting to existing main w 4.
Note 2 added protecto 401tm epoxy or equivalent standard for all ductile iron sewer pipe note 5 added puyallup municipal code reference and uniform plumbing code reference for grease interceptor requirements. F water mains shall be disinfected according to awwa standard c601 81 before being placed in service. Section 401 sanitary sewer system design criteria. To improve functionality section references in the 2020 standard specifications have been cross referenced linked to the corresponding section.
Water main crossing replacement detail w 9. Full version of the 2020 standard specifications pdf. Pipe clamp and anchor rods for concrete blocking w 6. Pre approved plans have been updated as of january 1 2020.
Historically the city of bellevue public water system has effectively treated this source water to meet drinking water quality standards for all regulated constituents with the exception of nitrate. 2020 water engineering standards 2020 water engineering standard details. Revised concrete vault note to remove outdated vault manufacturer reference. Concrete slope anchor detail w 5.
Standard specs and plans. Pre approved plans and policies are to be referred to by any individual or company designing constructing or maintaining water sewer storm drainage or street improvements in the city of kirkland. More detailed information is. Click the link in each item to download a pdf for the standards and specifications you re looking for.
2020 standard specifications for municipal construction. 3000 seneca industrial parkway bellevue oh 44811.